<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>jwr1ghtbra1n &#8211; WTI &#8211; Worobey Transport Incorporated</title>
	<atom:link href="https://wti-h2o.com/author/jwr1ghtbra1n/feed/" rel="self" type="application/rss+xml" />
	<link>https://wti-h2o.com</link>
	<description>Water Transport and Supply</description>
	<lastBuildDate>Wed, 23 Apr 2025 12:33:38 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://wti-h2o.com/wp-content/uploads/2024/10/cropped-W-icon-32x32.png</url>
	<title>jwr1ghtbra1n &#8211; WTI &#8211; Worobey Transport Incorporated</title>
	<link>https://wti-h2o.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Prison</title>
		<link>https://wti-h2o.com/prision/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:21:12 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=264</guid>

					<description><![CDATA[Luzerne County, PA Challenge A 20-inch water main break had a prison staring at the possibility of having no drinking water. They needed emergency potable water transport to maintain an adequate supply of water. Solution WTI dispatched two NSF 61-compliant tankers, two NSF 61-compliant potable transfer pumps, associated tubing, and fittings to facilitate temporary potable ... <a title="Prison" class="read-more" href="https://wti-h2o.com/prision/" aria-label="Read more about Prison">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>Luzerne County, PA A 20&#x2d;inch water main break had a prison staring at the possibility of having no drinking water. They needed emergency potable water transport to maintain an adequate supply of water. WTI dispatched two NSF 61&#x2d;compliant tankers, two NSF 61&#x2d;compliant potable transfer pumps, associated tubing, and fittings to facilitate temporary potable water delivery.</p>
<p><a href="https://wti-h2o.com/prision/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Water Treatment Plant</title>
		<link>https://wti-h2o.com/water-treatment-plant/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:20:20 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=262</guid>

					<description><![CDATA[Dauphin County, PA Challenge A water treatment plant that draws and treats water from a local stream was forced to shut down when filters became clogged. The situation was aggravated by a large water main break, causing storage tank levels to drop and creating the potential for system pressure loss. The timing could not have ... <a title="Water Treatment Plant" class="read-more" href="https://wti-h2o.com/water-treatment-plant/" aria-label="Read more about Water Treatment Plant">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>A water treatment plant that draws and treats water from a local stream was forced to shut down when filters became clogged. The situation was aggravated by a large water main break, causing storage tank levels to drop and creating the potential for system pressure loss. The timing could not have been worse as these events unfolded between Christmas and New Year&rsquo;s Day.</p>
<p><a href="https://wti-h2o.com/water-treatment-plant/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Hospital</title>
		<link>https://wti-h2o.com/hospital/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:19:29 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=260</guid>

					<description><![CDATA[Lehigh County, PA Challenge A utility easement issue caused a water main connection delay for a regional healthcare provider that was building a new hospital. The facility’s onsite laboratory certification was required two months prior to the hospital opening. The hospital could not open without this certification. Solution WTI engineered a pump solution to provide ... <a title="Hospital" class="read-more" href="https://wti-h2o.com/hospital/" aria-label="Read more about Hospital">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>A utility easement issue caused a water main connection delay for a regional healthcare provider that was building a new hospital. The facility&rsquo;s onsite laboratory certification was required two months prior to the hospital opening. The hospital could not open without this certification. WTI engineered a pump solution to provide DEP&#x2d;complaint water up to the fourth floor of the hospital&#8230;</p>
<p><a href="https://wti-h2o.com/hospital/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Medical Outpatient Facility</title>
		<link>https://wti-h2o.com/medical-outpatient-facility/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:18:45 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=258</guid>

					<description><![CDATA[Wyoming County, PA Challenge Drought conditions had depleted the water well of a regional healthcare provider with an outpatient facility in a rural community. The situation was dire as the facility was facing temporary closure, which would have affected access to important health services for residents. Solution WTI delivered DEP-compliant drinking water, using an NSF ... <a title="Medical Outpatient Facility" class="read-more" href="https://wti-h2o.com/medical-outpatient-facility/" aria-label="Read more about Medical Outpatient Facility">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>Drought conditions had depleted the water well of a regional healthcare provider with an outpatient facility in a rural community. The situation was dire as the facility was facing temporary closure, which would have affected access to important health services for residents. WTI delivered DEP&#x2d;compliant drinking water, using an NSF 61&#x2d;compliant transfer pump and tubing to transfer water&#8230;</p>
<p><a href="https://wti-h2o.com/medical-outpatient-facility/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Housing Community</title>
		<link>https://wti-h2o.com/housing-community/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:17:47 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=256</guid>

					<description><![CDATA[Lackawanna County, PA Challenge A housing community with 50 homes required a temporary water source during the 15-day process of drilling a new, DEP-permitted water well. Solution WTI provided an NSF 61-compliant storage tanker, a variable frequency drive pump, tubing, and fittings to connect to the housing community’s existing distribution system. We also transported DEP-certified ... <a title="Housing Community" class="read-more" href="https://wti-h2o.com/housing-community/" aria-label="Read more about Housing Community">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>A housing community with 50 homes required a temporary water source during the 15&#x2d;day process of drilling a new, DEP&#x2d;permitted water well. WTI provided an NSF 61&#x2d;compliant storage tanker, a variable frequency drive pump, tubing, and fittings to connect to the housing community&rsquo;s existing distribution system. We also transported DEP&#x2d;certified potable water as needed.</p>
<p><a href="https://wti-h2o.com/housing-community/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Retirement Apartment Complex</title>
		<link>https://wti-h2o.com/retirement-apartment-complex/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:16:59 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=254</guid>

					<description><![CDATA[Wyoming County, PA Challenge A 45-unit retirement apartment complex was faced with the prospect of relocating its residents due to contamination of a water well. They turned to WTI for temporary water delivery. Solution WTI delivered DEP-compliant drinking water using an NSF 61-compliant transfer pump and tubing to transfer water into the client’s storage tanks ... <a title="Retirement Apartment Complex" class="read-more" href="https://wti-h2o.com/retirement-apartment-complex/" aria-label="Read more about Retirement Apartment Complex">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>A 45&#x2d;unit retirement apartment complex was faced with the prospect of relocating its residents due to contamination of a water well. They turned to WTI for temporary water delivery. WTI delivered DEP&#x2d;compliant drinking water using an NSF 61&#x2d;compliant transfer pump and tubing to transfer water into the client&rsquo;s storage tanks every day for more than two years.</p>
<p><a href="https://wti-h2o.com/retirement-apartment-complex/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Apartment Building</title>
		<link>https://wti-h2o.com/apartment-building/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:15:59 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=252</guid>

					<description><![CDATA[Lebanon County, PA Challenge A three-story, 38-unit apartment building required a temporary drinking water system during a scheduled water main replacement over a five-day period. The temporary system would prevent the residents from being displaced. Solution WTI engineered and installed a temporary PA DEP-compliant temporary water system, which consisted of an NSF 61-compliant storage tanker ... <a title="Apartment Building" class="read-more" href="https://wti-h2o.com/apartment-building/" aria-label="Read more about Apartment Building">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>A three&#x2d;story, 38&#x2d;unit apartment building required a temporary drinking water system during a scheduled water main replacement over a five&#x2d;day period. The temporary system would prevent the residents from being displaced. WTI engineered and installed a temporary PA DEP&#x2d;compliant temporary water system, which consisted of an NSF 61&#x2d;compliant storage tanker and a variable frequency drive&#8230;</p>
<p><a href="https://wti-h2o.com/apartment-building/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Industrial Ice-Making Facility</title>
		<link>https://wti-h2o.com/industrial-ice-making-facility/</link>
		
		<dc:creator><![CDATA[jwr1ghtbra1n]]></dc:creator>
		<pubDate>Wed, 25 Sep 2024 19:13:53 +0000</pubDate>
				<category><![CDATA[Case Study]]></category>
		<guid isPermaLink="false">https://wti-h2o.com/?p=250</guid>

					<description><![CDATA[Lackawanna County, PA Challenge When the water well of an industrial ice making facility became contaminated, operations were forced to shut down. The facility urgently needed a temporary water system to return the plant online. Solution WTI engineered a temporary, PA DEP-compliant water system. The system was comprised of an NSF 61-compliant storage tanker and ... <a title="Industrial Ice-Making Facility" class="read-more" href="https://wti-h2o.com/industrial-ice-making-facility/" aria-label="Read more about Industrial Ice-Making Facility">Read more</a>]]></description>
										<content:encoded><![CDATA[<p>When the water well of an industrial ice making facility became contaminated, operations were forced to shut down. The facility urgently needed a temporary water system to return the plant online. WTI engineered a temporary, PA DEP&#x2d;compliant water system. The system was comprised of an NSF 61&#x2d;compliant storage tanker and a variable frequency drive pump capable of running the facility&rsquo;s&#8230;</p>
<p><a href="https://wti-h2o.com/industrial-ice-making-facility/" rel="nofollow">Source</a></p>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
