Prison

Luzerne County, PA Challenge A 20-inch water main break had a prison staring at the possibility of having no drinking water. They needed emergency potable water transport to maintain an adequate supply of water. Solution WTI dispatched two NSF 61-compliant tankers, two NSF 61-compliant potable transfer pumps, associated tubing, and fittings to facilitate temporary potable … Read more

Water Treatment Plant

Dauphin County, PA Challenge A water treatment plant that draws and treats water from a local stream was forced to shut down when filters became clogged. The situation was aggravated by a large water main break, causing storage tank levels to drop and creating the potential for system pressure loss. The timing could not have … Read more

Hospital

Lehigh County, PA Challenge A utility easement issue caused a water main connection delay for a regional healthcare provider that was building a new hospital. The facility’s onsite laboratory certification was required two months prior to the hospital opening. The hospital could not open without this certification. Solution WTI engineered a pump solution to provide … Read more

Medical Outpatient Facility

Wyoming County, PA Challenge Drought conditions had depleted the water well of a regional healthcare provider with an outpatient facility in a rural community. The situation was dire as the facility was facing temporary closure, which would have affected access to important health services for residents. Solution WTI delivered DEP-compliant drinking water, using an NSF … Read more

Housing Community

Lackawanna County, PA Challenge A housing community with 50 homes required a temporary water source during the 15-day process of drilling a new, DEP-permitted water well. Solution WTI provided an NSF 61-compliant storage tanker, a variable frequency drive pump, tubing, and fittings to connect to the housing community’s existing distribution system. We also transported DEP-certified … Read more

Retirement Apartment Complex

Wyoming County, PA Challenge A 45-unit retirement apartment complex was faced with the prospect of relocating its residents due to contamination of a water well. They turned to WTI for temporary water delivery. Solution WTI delivered DEP-compliant drinking water using an NSF 61-compliant transfer pump and tubing to transfer water into the client’s storage tanks … Read more

Apartment Building

Lebanon County, PA Challenge A three-story, 38-unit apartment building required a temporary drinking water system during a scheduled water main replacement over a five-day period. The temporary system would prevent the residents from being displaced. Solution WTI engineered and installed a temporary PA DEP-compliant temporary water system, which consisted of an NSF 61-compliant storage tanker … Read more

Industrial Ice-Making Facility

Lackawanna County, PA Challenge When the water well of an industrial ice making facility became contaminated, operations were forced to shut down. The facility urgently needed a temporary water system to return the plant online. Solution WTI engineered a temporary, PA DEP-compliant water system. The system was comprised of an NSF 61-compliant storage tanker and … Read more