Challenge
When the water well of an industrial ice making facility became contaminated, operations were forced to shut down. The facility urgently needed a temporary water system to return the plant online.
Solution
WTI engineered a temporary, PA DEP-compliant water system. The system was comprised of an NSF 61-compliant storage tanker and a variable frequency drive pump capable of running the facility’s four ice-making units simultaneously. We also plumbed in a filling station to fill the supply tanker during operations.
Results
WTI provided the ice-making facility with a temporary water system and water on demand for a one-year period, totaling 7 million gallons, without interruption. We met our contractual obligation to produce up to 1.5 million pounds of ice per week and maintained DEP compliance throughout the project.